top of page

UTSW St. Paul Hospital

Project Overview

Lindamood performed demolition and excavation of the historic St. Paul University Hospital campus, once a cornerstone of the UT Southwestern system. The project included removal of seven interconnected buildings and two expansive parking lots within an active medical district.


One of the primary structures — a twelve-story tower and the oldest building on the site — was safely brought down through controlled implosion. The work required careful sequencing, engineered planning, and coordination to protect adjacent facilities and maintain uninterrupted campus operations.


Key project elements included:

  • Demolition of seven buildings within an active healthcare campus

  • Controlled implosion of a 12-story landmark structure

  • Demolition and excavation of two large parking lots

  • Coordination to avoid disruption to ongoing hospital operations

  • Integrated demolition and earthwork under a single contract


The project was executed under strict schedule constraints, utilizing innovative removal methods to ensure safety, operational continuity, and efficient transition to future redevelopment.





News Articles

Watch Live Stream Of St. Paul University Hospital's Implosion - CBS Texas

St. Paul Demolition Closures - UT Southwestern, Dallas, Texas

Client

Vaughn Construction

Location

Dallas, TX

Duration

Market

Healthcare

Got a Project?

bottom of page