Texas A&M Kyle Field
Project Overview
As part of the Kyle Field renovation, Lindamood performed complex structural separation and demolition of the stadium’s lower bowl and East-side seating sections while preserving adjacent portions of the facility slated to remain. The work required controlled dismantling of interconnected structural systems to isolate the East-side lower bowl from remaining stadium components and the adjoining basketball arena. Demolition sequencing was developed to maintain global structural stability and prevent unintended load transfer during removal operations.
Scope highlights included:
Structural separation of lower bowl and East-side seating sections
High-reach top-down demolition of East and West end caps
Remote-controlled implosion operations
Full abatement and utility disconnections prior to structural removal
Demolition of associated campus facilities including F. Rollie White Coliseum, the Read Annex and Read Building, and multiple stadium support structures
Lowering of the playing field by seven feet
Complete debris removal and haul-off services
All activities were sequenced to meet an accelerated schedule tied to the upcoming football season. Work was executed in coordination with the University to protect remaining facilities and maintain operational continuity.
Client
Manhattan Construction
Location
College Station, TX
Duration
Market
Sports & Arenas