top of page

DFW Airport Terminal C Parking Garage

Project Overview

Lindamood performed full structural demolition of Parking Garage C at Dallas Fort Worth International Airport, clearing the site for construction of a new six-story parking facility as part of DFW’s $9 billion capital improvement program.


The project required complete demolition of the existing multi-level structure within an active landside airport environment, with careful sequencing to maintain vehicular circulation and pedestrian access throughout operations.


Key project elements included:

  • Full demolition of the multi-level parking structure

  • Operations within an active, high-traffic airport environment

  • Phased sequencing to maintain access

  • Coordinated traffic detours during critical activities

  • Comprehensive dust mitigation measures

  • Compliance with airport safety and access control protocols


Execution required controlled structural removal and continuous coordination with airport stakeholders to minimize disruption. The project demonstrates Lindamood’s ability to perform full-scale demolition in highly visible aviation environments while maintaining safety and operational continuity.

Client

Suffolk Construction

Location

Dallas, TX

Duration

Market

Aviation

Got a Project?

bottom of page