
DFW Airport Terminal C Parking Garage
Project Overview
Lindamood performed full structural demolition of Parking Garage C at Dallas Fort Worth International Airport, clearing the site for construction of a new six-story parking facility as part of DFW’s $9 billion capital improvement program.
The project required complete demolition of the existing multi-level structure within an active landside airport environment, with careful sequencing to maintain vehicular circulation and pedestrian access throughout operations.
Key project elements included:
Full demolition of the multi-level parking structure
Operations within an active, high-traffic airport environment
Phased sequencing to maintain access
Coordinated traffic detours during critical activities
Comprehensive dust mitigation measures
Compliance with airport safety and access control protocols
Execution required controlled structural removal and continuous coordination with airport stakeholders to minimize disruption. The project demonstrates Lindamood’s ability to perform full-scale demolition in highly visible aviation environments while maintaining safety and operational continuity.
Client
Suffolk Construction
Location
Dallas, TX
Duration
Market
Aviation
.png)