23 Springs

Project Overview

This project involved the deconstruction of three four-story buildings located just 10 feet from a major arterial roadway in Uptown Dallas. The tight urban footprint and limited access required high-reach excavators and carefully engineered sequencing to safely dismantle the structures while maintaining traffic flow and protecting surrounding infrastructure.


The buildings were constructed atop a three-story underground parking garage, which was demolished as part of an integrated site redevelopment strategy. Following structure removal, Lindamood transitioned into mass excavation to construct a new basement for a future high-rise development.


Key project elements included:

  • Demolition within 10 feet of an active major roadway

  • High-reach operations in a constrained urban environment

  • Removal of a three-story below-grade parking structure

  • Coordinated demolition and excavation under a single contract

  • Transition from structural removal to basement excavation for vertical redevelopment


This dual-phase project required disciplined coordination, sequencing, and logistics management to ensure safe operations within a dense urban corridor. The work was executed without disruption to surrounding traffic or adjacent properties, positioning the site for accelerated vertical construction.


News Artlices

More than $500 million in buildings going up along Uptown Dallas’ Maple Avenue

Client

DPR Construction

Location

Dallas, TX

Duration

Market

Commercial